Get free estimate
Or email hello@webcof.com
1

Free online estimate

Instant · 0 minutes

Drag the slider on our home page with your current monthly electricity bill. Within seconds, you'll see your projected system size, annual savings, payback period, and subsidy eligibility. No personal details required to use it.

  • Real-time calculation based on your city's solar irradiance and tariff
  • Output matches our internal engineering estimates within 8% accuracy
  • Save or screenshot to revisit later — no account needed
2

Detailed report on WhatsApp

Within 2 hours

Share your name and pincode through our contact form. We'll send you a personalised PDF report on WhatsApp with exact system specs, payback timeline, subsidy eligibility, and financing options. No phone calls unless you ask for one.

  • Custom recommendation based on your bill, city, and rooftop type
  • Engineering specifications: panel make/model, inverter, mounting structure
  • Three financing options — upfront, EMI, and zero-down lease
3

Free site survey

Within 48 hours of confirmation

An engineer visits your property with a drone, structural gauge, and shadow-analysis tablet. They verify roof load capacity, run a shadow-impact study across the year, and finalise the panel layout. You get the final design within 24 hours of the visit.

  • Structural load assessment for safe panel mounting
  • Year-round shadow simulation to maximise generation
  • 3D rendered visualisation of your final installation
  • Walkthrough of the design and any concerns you have
4

Subsidy & net metering filing

1–2 weeks

Once you approve the design, we file your PM Surya Ghar subsidy application on the National Portal, along with DISCOM net metering registration. You sign documents digitally — we handle the rest. Approval is typically 7–14 days.

  • Full PM Surya Ghar Yojana subsidy application — we are MNRE empanelled
  • DISCOM net metering registration and feasibility study coordination
  • You receive a tracking ID and approval timeline on day one
5

Installation

1–2 days on-site

Our certified installation team arrives with all equipment, mounting structures, and safety gear. Most residential installs complete in a single day. We protect your terrace surfaces, clean up after, and walk you through every component before leaving.

  • BIS-certified installation team with structured safety protocols
  • Zero damage to existing rooftop waterproofing or structure
  • Full system walkthrough including app setup on your phone
  • Photo & video documentation of the completed install
6

Net metering connection

1–2 weeks after install

After installation, DISCOM sends an inspector to verify your system. We coordinate the visit, are present during inspection, and handle any compliance documentation. Once approved, your bi-directional meter is installed and you start exporting excess generation.

  • DISCOM coordination — we attend the inspection with you
  • Bi-directional meter installation by DISCOM technicians
  • First export reading recorded for your records
7

You go live

Day-1 savings begin

Your app activates the moment we commission the system. From hour one, you'll see real-time generation, your daily savings in rupees, and CO₂ offset. Our team continues to monitor your system remotely — we'll know about issues before you do.

  • Lifetime free access to monitoring app (iOS + Android)
  • Remote 24/7 system health monitoring from our operations centre
  • Quarterly performance reports comparing against projections
  • Service SLA: 24-hour response, 72-hour resolution for any issue

Ready to start step one?

The entire end-to-end timeline is typically 3 to 5 weeks. Your savings start the day your meter is connected.

Chat Free estimate